PETER'S COLUMN Views and Analysis
HKU 2027 Before the application is opened, Peter reminds us of the course of his education.
Non-JUPAS is the application conduit; It would be more helpful to confirm education, subjects and documents first than to wait for the system to be open.
Original date: Facebook in 2026-09-22 shows "No confirmation date on the original page". (a) The years and time zones not shown have not been added to the records as shown by the platform; View original post ↗
Peter reminds Taiwan students who wish to apply to the University of Hong Kong to find out which kind of academic application they are applying for instead of seeing Non-JUPAS, the name is considered irrelevant.
Non-JUPAS is a conduit, not a pledge.
The Hong Kong International/Non-JUPAS page indicates that eligibility for international or other designated national examinations can be applied through the appropriate channels, still in accordance with the rules of status and education. Minimum conditions, subject requirements and individual course reviews are to be checked separately.
What can we do before the opening day?
The official reminder for this check is that the application was opened on September 23rd, 2026. Peter suggested that the system should be preceded by the selection of the desired department, the preparation of the high school grades and learning experience, the preparation of an English proficiency certificate and personal statements, and coordination with the proposer.
We have to check each other out.
Taiwan High School, OSSD, IB, A-Level or United States High School programmes cannot be applied to one another with the same report sheet alone. The focus of Peter is on first confirming his academic qualifications, prognosis and subject preparation, and then researching applications for voluntary service.
Next steps for the family
The network of course officers, the rules of education, the division of work on documents and the delivery nodes are organized. The open day is only the beginning and does not mean that a follow-up cut-off date can be ignored; No external dates are used for the present edition, but please return to the current bulletin once the formal system is open.